MY Ocean Liberty – Refurbishment – Complete Overhaul

MY Ocean Liberty – Refurbishment – Complete Overhaul

Start Date 

Finish Date

Client

2000

2001

Motor Yacht  “Ocean Liberty”

Description
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam posuere, dui non finibus dictum, magna ante gravida est, id vehicula libero eros at nisl. Cras non dictum tellus, non tincidunt nisi. Morbi pellentesque rutrum lorem in posuere. Fusce finibus at orci et consectetur. Lorem ipsum dolor sit amet, consectetur adipiscing elit. In this is a link quis blandit. Suspendisse dolor metus, this is a link on hover sed erat a, dignissim dictum enim. Sed egestas aliquet mi quis maximus. Nunc semper rutrum neque, sed congue quam. Pellentesque eu nulla ac eros finibus tempor.

MY Ocean Liberty was designed by the prestigious Camper and Nicholson in 1966. In the year 2000 the owners issued an international call, through their management company, to refurbish and complete an overhaul of the Yacht.

The Owners of this beautiful yacht had picked our yard because they were impressed with the facilities we could offer and all the works we could cover with our own personnel. At the time the yacht was berthed in Monte Carlo and it sailed to Malta for this extensive project to be completely overhauled. The fact that the yacht travelled all the way to Malta clearly showed the owner’s willingness to do the works at our yard.

As in other projects we ensured that we gave our all towards this project giving the crew of the Ocean Liberty the best of hospitalities. This is one of our major strong points of our yard. We fall in love with the Yachts we are servicing and maintaining treating them as if they are our own. During the works we kept constant communication with the yacht captain clearly explaining the progress and the works being done. The following are the main works we covered for the Ocean Liberty:

  • Big repairs to the hull
  • Alterations to the aluminium super structure
  • Installation of new electrical wiring and systems
  • Installation of new engines and generators
  • Fitting of new piping and fire-fighting system
  • Replacement of upholstery
  • New furniture and fittings
  • Replacement and installation of new teak decking
  • New woodwork
  • Overall painting of the yacht which was fully under our responsibility.

This was one of the most challenging but most rewarding contracts we completed in recent years. The input of our engineering department was crucial in the success of this project. All works were completed in the most professional manner and to the satisfaction of the Captain and the Ship Owners. In the end this is always our ultimate objective.

Share this article

Interested in doing business with us?

Work with a partner you can trust. Through our personalised and professional approach we are sure to build a long-lasting business relationship with you.

MY Pepito – Design and Built from Scratch of 24-meter Motor Yacht

MY Pepito - Design and Built from Scratch of 24-meter Motor Yacht

Start Date

Finish Date

Client

2004

2005

Bezzina Yacht Yard Ltd

Description
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam posuere, dui non finibus dictum, magna ante gravida est, id vehicula libero eros at nisl. Cras non dictum tellus, non tincidunt nisi. Morbi pellentesque rutrum lorem in posuere. Fusce finibus at orci et consectetur. Lorem ipsum dolor sit amet, consectetur adipiscing elit. In this is a link quis blandit. Suspendisse dolor metus, this is a link on hover sed erat a, dignissim dictum enim. Sed egestas aliquet mi quis maximus. Nunc semper rutrum neque, sed congue quam. Pellentesque eu nulla ac eros finibus tempor.

This was our company’s dream. Our very own design and building of a luxurious motor yacht. The design was carried out by a reputable Italian engineering company and all the building works were carried out by our yard.

Fabrication of the hull and superstructure were completely done in-house at our state-of-the-art fabrication shop. The same with regards to all the wood which were completely done by our experienced carpenters with the support of several reputable sub-contractors in the marine industry locally. Piping, firefighting, mechanical and engineering works were all performed by our engineering department. All electronic equipment was purchased from Italy and commissioned by our yard. The painting of the hull, the superstructure and the teak decking were carried out to
highest levels and the finest of details by our own professional employees.

The complete built of this vessel at our yard is the first one of its kind in Malta. To top it up this Motor Yacht was completed in just under one year. This is an exceptional timing considering all the complexities this project entailed.

Share this article

Interested in doing business with us?

Work with a partner you can trust. Through our personalised and professional approach we are sure to build a long-lasting business relationship with you.

Infrastructure Malta – Quay Consolidation and Dredging Works at the Mgarr Port Fishing Harbour, Malta

Infrastructure Malta – Quay Consolidation and Dredging Works at the Mgarr Port Fishing Harbour, Malta
Start Date
Finish Date
Client
Project Value
2019
2020
Infrastructure Malta
€ 4,000,000
Description
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam posuere, dui non finibus dictum, magna ante gravida est, id vehicula libero eros at nisl. Cras non dictum tellus, non tincidunt nisi. Morbi pellentesque rutrum lorem in posuere. Fusce finibus at orci et consectetur. Lorem ipsum dolor sit amet, consectetur adipiscing elit. In this is a link quis blandit. Suspendisse dolor metus, this is a link on hover sed erat a, dignissim dictum enim. Sed egestas aliquet mi quis maximus. Nunc semper rutrum neque, sed congue quam. Pellentesque eu nulla ac eros finibus tempor.

An international call for tenders was issued and awarded to BH Joint Venture, a joint venture between Bezzina Maritime Services Limited and Road Construction Company Limited based in Gozo. Bezzina Maritime Services Limited acted as the lead partner on this venture.

The project covered land and marine works, strengthening of jetty with sheet piles and bored piles, placing of revetment along the jetty, removal and construction of new slipways and capital dredging works in the North and South Bay of Mgarr Port in Gozo.

The works covered by Bezzina maritime were sheet piling, fabrication of rotary pipes for piling, part placing of the revetment and capital dredging works. The dredging works included the removal of contaminated materials from the seabed and safe disposal of same to assigned dumping sites. The remaining civil works were carried out by Road Construction Company.

All works were completed by the end 2020 as stipulated in the tender document.

Share this article

Interested in doing business with us?

Work with a partner you can trust. Through our personalised and professional approach we are sure to build a long-lasting business relationship with you.
2000
2001
Motor Yacht “Ocean Liberty”
€ 3,500,000

Malta Freeport Terminal Ltd – Erection and Maintenance of Freeport Equipment

Malta Freeport Terminal Ltd – Erection and Maintenance of Freeport Equipment
Start Date
Finish Date
Client
Project Value
1995
2005
Malta Freeport Terminals Ltd.
€ 6,000,000
Description

Between 1995 and 2005, Malta Freeport Terminals Limited invested heavily in port related equipment and machinery. Our company was engaged to carry out several engineering and construction works during the same period.

In the beginning we were commissioned to erect 13 Rubber Tired Gantries (RTGs) and 6 Quay Cranes (QCs). Given the size of the project entrusted to us, the Group had decided to buy a 400-ton crane that would support the required works and complete our fleet. At the time, the crane was the largest of its sort in in Malta.

During these years, Malta Freeport entrusted us with the maintenance and repairs of the same and this because we had extensive knowledge in this sector. Some of the repairs (which included mechanical and electrical overhauls, blasting and painting) were carried out at a yard within the Terminal. This required the shifting of quay side rails from the jetty to the working area at the yard and the towing of quay side cranes using our heavy trucks.

Over more recent years larger vessels started calling at Malta Freeport who in turn continued to invest in its terminal. An international tendering call was issued for the revamping and upgrade of the quay side cranes. Our company was successful in getting this tender, together with OMG of Italy. The tender involved the revamp of 2 quay side cranes by increasing the height of the cranes by 6 meters and increasing the height of the boom by another 6 meters. This operation was engineered and certified complete by the original designers of the crane and was carried out to the satisfaction of the client. This kind of intervention to a quay side crane had never been done before internationally and we pride ourselves of the great job done on this project. We had done similar jobs though in Italy, Spain, and Algeria.

Recently Malta Freeport Terminals Limited decided to purchase readily erected quay side cranes from ZPMC of China and we were involved in all the commissioning of this machinery. This also paved the way for the removal of the original quay side cranes, which were then dismantled and carted away by our company.

Share this article

Interested in doing business with us?

Work with a partner you can trust. Through our personalised and professional approach we are sure to build a long-lasting business relationship with you.