Skip to content
Infrastructure Malta – Quay Consolidation and Dredging Works at the Mgarr Port Fishing Harbour, Malta
Start Date
Finish Date
Client
Project Value
2019
2020
Infrastructure Malta
€ 4,000,000
Description
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam posuere, dui non finibus dictum, magna ante gravida est, id vehicula libero eros at nisl. Cras non dictum tellus, non tincidunt nisi. Morbi pellentesque rutrum lorem in posuere. Fusce finibus at orci et consectetur. Lorem ipsum dolor sit amet, consectetur adipiscing elit. In this is a link quis blandit. Suspendisse dolor metus, this is a link on hover sed erat a, dignissim dictum enim. Sed egestas aliquet mi quis maximus. Nunc semper rutrum neque, sed congue quam. Pellentesque eu nulla ac eros finibus tempor.

An international call for tenders was issued and awarded to BH Joint Venture, a joint venture between Bezzina Maritime Services Limited and Road Construction Company Limited based in Gozo. Bezzina Maritime Services Limited acted as the lead partner on this venture.

The project covered land and marine works, strengthening of jetty with sheet piles and bored piles, placing of revetment along the jetty, removal and construction of new slipways and capital dredging works in the North and South Bay of Mgarr Port in Gozo.

The works covered by Bezzina maritime were sheet piling, fabrication of rotary pipes for piling, part placing of the revetment and capital dredging works. The dredging works included the removal of contaminated materials from the seabed and safe disposal of same to assigned dumping sites. The remaining civil works were carried out by Road Construction Company.

All works were completed by the end 2020 as stipulated in the tender document.

Share this article

Interested in doing business with us?

Work with a partner you can trust. Through our personalised and professional approach we are sure to build a long-lasting business relationship with you.

Related Articles

2000
2001
Motor Yacht “Ocean Liberty”
€ 3,500,000